The manual server lift solution SL350X is ready for use within minutes. It is capable of moving up to 159 kilograms of IT equipment to any location within the Data Centre. There, the load can be lifted to a maximum height of 2.4 metres. A single operator is able to navigate the heavy load easily through doorways, narrow Data Centre aisles and can rotate on it on its axis to any degree and into the smallest of spaces.
The ServerLIFT SL350x side loading capabilities allows the operator to work from either the left or right hand side of the unit. This provides the ideal alignment and shelf position for the integration and installation of heavy IT equipment into the cabinet: After the IT components are vertically lifted to the required height the servers can be horizontally inserted via the extendable platform of the ServerLift into the free RU space of the rack. So the final rack mounting and cabling requires fewer personnel and eliminates potential injury.
Please see our datasheet here.
At Comms Online, we are committed to ensuring customer satisfaction. If you’re not entirely happy with your purchase, we’re here to help.
If you wish to exchange an item, please contact us directly to check stock availability and arrange the exchange process.
Free delivery Available
On all orders over £150
Give us a call
03301 330 695
E-mail us
Sales@commsonline.co.uk
Secure payments
All major payment methods accepted